Laying of blocks, fence wall foundation excavation, sceptic tank, plastering, dressing, please note for blocks setting its 2 bag's of cement a day which we expected to lay 135 PC's of blocks, for plaster it's expected to plaster two sides of the room, we don't count cement for dressing, it's normally 3 windows a day.
For concrete depending the nature of the work, for normal (11⁄2ft) foundation digging it's 100 cedi per 10ft, then for the story building foundation it's 150 GHC per 2ft6-3ft.
And i do charge for site visitation 200 cedi at any where in Accra Axis.
But outside Accra it's 400 cedi before moving from house.
Thank you.