tre.gif
Sell faster
Buy smarter
  1. All ads
  2. Animals & Pets
  3. Pet's Accessories
Promoted
Greater Accra, Dome, 1 hour ago
7 views

10m Waterproof High-Vis Orange Dog Training Tracking Long Lead

Used
Condition
Accessories
Type
Leash
Subtype
Store address
Greater Accra • Oyarifa
Oyarifa Opposite kuottam police station.
Open now
• Mon - Sun, 08:00-20:00
Greater Accra • Accra Metropolitan
Kantamanto
Opposite Grand View Hotel
Open now
• Mon - Sat, 07:00-16:30
High-visibility neon orange heavy-duty waterproof dog training and tracking long line leash. Constructed from durable PVC-coated webbing that resists water, mud, odor, and tangled knots while providing long-distance freedom during recall training. Key Features: Item Type: Dog Recall & Tracking Long Line Lead Material: Waterproof PVC / TPU coated heavy-duty dirt-proof webbing Hardware: Solid zinc-alloy heavy-duty 360° swivel snap hook Length: Extra-long tracking line (10 meters / 33 feet+) Key Benefits: Easy to wipe clean, non-absorbent, rot-resistant, and high visibility in grass/bush Ideal For: K9 field training, recall obedience, hunting dogs, and open-field walking
Show contact
10m Waterproof High-Vis Orange Dog Training Tracking Long Lead
GH₵ 250
212 Feedbackview all
Report Abuse
Safety tips
  • Avoid paying in advance, even for delivery
  • Meet with the seller at a safe public place
  • First, check what you're going to buy to make sure it's what you need
  • Only pay if you're satisfied
frame_left.gif