Prepare the surface: Chip off the top layer of the surface by at least 10-15 mm, sweep away the dust, and water the area
Prepare the cement slurry: Mix Dr. Fixit with cement to create a slurry
Prepare the concrete: Mix cement, sand, and 10 mm aggregate in a ratio of 1:1.5:3
Add latex: Add 100 ml of latex for every bag of cement when mixing with water
Pour the concrete: Use a wooden batten to level the concrete
Allow to pond: Let the concrete pond for at least 10 days